Resources
Tenant Improvement Guides
Expert resources to help you plan, budget, and execute your next commercial renovation in Vancouver & the Lower Mainland.
Subscribe via RSSAll Guides

Planning a Restaurant Interior? Give the Walls and Ceiling a Clear Brief
Rambo’s Popeyes Vancouver framing and Thai restaurant baffles show the decisions to make before pricing a restaurant fit-out.

Your Next Langley TI: Useful Rooms and a Ceiling That Fits
Plan commercial partitions and ceiling choices with Rambo’s Langley TI, DP World baffle, T-bar and The Post panel examples.

Regus Mission: Planning Your Office Renovation
Planning an office renovation in Mission? See real project photos and learn what to ask about layout, finishes, quotes and scheduling.

Club Champion Surrey: Planning a Retail Renovation
Planning a retail renovation in Surrey? See real project photos and learn what to ask about layout, finishes, quotes and scheduling.

Before You Lease: Compare the Fit-Out, the Allowance and the Work Still Required
Two commercial spaces can carry similar rents and need very different construction budgets. Compare the premises, proposed work and funding arrangements together.

Burquitlam Meeting Room, Commercial Washroom and Vestibule Tenant Improvement
A documented strata interior renovation on the Burnaby side of Burquitlam combined a meeting-room ceiling and lighting upgrade with hallway framing for a three-stall commercial washroom and an exterior vestibule.

Vancouver Tenant Improvement Planning: Scope, Permits and Bids
Plan a Vancouver commercial renovation around the existing building, permit scope, landlord approvals and comparable contractor bids.

Richmond Tenant Improvements: Lease, Systems and Permit Planning
For a Richmond build-out, confirm the proposed use, base-building capacity and landlord requirements before pricing. Submit the appropriate commercial TI application and coordinate any separate approvals.

Burnaby Commercial Renovations: Approvals, Access and Scope
Plan a Burnaby TI around the property, proposed use and current approval sequence. Check landlord access rules and system capacity before comparing construction bids.

Tri-Cities Tenant Improvements: Coquitlam, PoCo and Port Moody
Confirm the municipality for a Tri-Cities property before planning approvals. Match the build-out to the existing suite, business use, landlord requirements and available services.

Coordinating Framing and Drywall in a Tenant Improvement
A practical scope checklist for coordinating framing and drywall work on a commercial interior project.

Restaurant Build-Out: From Lease Review to Opening
Before leasing a restaurant space, test the menu, equipment and service requirements against the building. Coordinate municipal, health, landlord and other applicable approvals before construction.

School Renovations: Summer Work, Occupied Areas and Handover
Plan a school renovation around the teaching calendar, safe separation, procurement and commissioning. A summer closure is a constraint to test, not a guaranteed construction duration.

Institutional Renovations: Public Access, Procurement and Operations
For libraries, government offices and nonprofit facilities, define service continuity and approval responsibilities before tendering. Coordinate access, privacy, maintenance and procurement with the owner.

Hybrid Office Planning: Measure Demand Before Building
Use your own attendance and room-demand evidence to plan a hybrid office. Balance focused work, calls, meetings and shared services before committing to fewer desks or more meeting rooms.

Vancouver Steel Stud TI Scope: What to Put in the Brief
A useful framing brief identifies the rooms, wall assemblies, openings, backing and coordination responsibilities. Confirm the contracting firm and scope directly rather than assuming every trade is included.

Construction Guest Articles: Submission and Editorial Guidelines
Prepare a useful construction article, document your sources and confirm editorial arrangements before publication.

Office Build-Out Costs and Timeline: A Scope-First Budget
Compare office renovation bids by scope, allowances, existing systems and schedule dependencies before committing to a construction budget.

Medical and Dental Build-Outs: Define the Clinical Scope First
A consultation office, dental practice and procedural facility need different planning. Define the services and equipment with the clinical lead before selecting rooms, systems or approval pathways.

Commercial Kitchen Design: Workflow, Equipment and Services
Start kitchen design with the menu and workflow, then coordinate equipment, clean and dirty routes, ventilation, plumbing, electrical services and health review.

Retail Renovations: Customer Routes, Merchandising and Operations
Plan a retail renovation around customer movement, accessible routes, staff workflow and merchandise. Test the layout before committing to fixtures and avoid treating design changes as guaranteed sales growth.

Tenant Improvement Permits: A Vancouver Planning Checklist
Prepare a Vancouver TI permit scope, coordinate landlord and trade approvals, and plan inspections before closing walls or opening the business.

Warehouse Tenant Improvements: Racking, Offices and Building Capacity
Plan warehouse improvements around storage, handling equipment, people and building systems. Office additions, racking and process changes need coordinated review rather than a finish-only estimate.

Building Codes for Tenant Improvements: A Decision Guide
Establish the jurisdiction, applicable code edition, existing use and proposed work before designing a TI. National model codes, provincial rules and municipal requirements are not interchangeable.

TI Discovery: The Site Review Before Design and Pricing
Discovery establishes what the business needs, what the premises can support and which unknowns must be investigated. Its output should be a written brief, risk list and next-step plan.

Steel Stud or Wood Framing for a Commercial Fit-Out?
Choose framing as part of the required wall system. Building rules, structural needs, fire resistance, acoustics, moisture conditions and installation details matter more than a universal material preference.

Tenant Improvement Allowances: Questions Before Signing
A TI allowance is a negotiated contribution with conditions. Clarify eligible costs, payment timing, approvals and reinstatement responsibilities before relying on it to fund the build-out.

Sustainable Tenant Improvements: Reuse, Energy and Evidence
Start with what can safely remain, then evaluate energy, materials, maintenance and replacement. Set measurable project goals and verify product claims instead of assuming every green-labelled option saves money.

Commercial Renovation Inspections: Plan Before Concealing Work
Build an inspection plan from the issued approvals and trade scopes. Assign booking responsibility, preserve access to work needing review, and track corrections and final records.

Commercial TI Systems: HVAC, Electrical and Plumbing Coordination
Define the proposed use and equipment loads before reusing building services. Coordinate ventilation, electrical supply, plumbing, fire protection and maintenance access with the layout.

Workplace Design Choices for 2026: What Is Worth Building?
Evaluate office design ideas against work patterns, acoustic needs, maintainability and future change. Use evidence from your own workplace instead of assumed productivity or space-saving percentages.

TI Cost Control: Scope, Allowances and Change Decisions
Control a TI budget by tracking the complete scope, committed costs, allowances and proposed changes. A low initial estimate is not evidence of a low final project cost.

Commercial Renovation Accessibility: BC, Vancouver and US ADA
Separate BC and Vancouver accessibility requirements from US ADA rules, and plan accessible routes, entrances, washrooms and service areas early.


