    Tenant Improvement Permits: A Vancouver Planning Checklist

    3 min readNovember 20, 2025By TI Contractors TeamUpdated 2026-10-05

    Do tenant improvements need permits?

    Do not assume that interior work is exempt because it is inside an existing building. Describe the proposed work and use to the relevant authority before construction. The answer depends on the jurisdiction, scope and existing premises. This guide focuses on Vancouver planning; confirm the process separately in other cities.

    Identify the approval route before finalizing the layout

    Ask the designer to document the existing and proposed use, room layout, occupant assumptions, affected systems and any changes outside the suite. Confirm landlord requirements and identify work touching common areas or base-building services.

    The City’s Building By-law page explains the governing framework and links to current bulletins. Use the application forms and checklists appropriate to the proposal. Do not assume that one application covers building work, every trade, signage and business operations.

    Assemble a coordinated submission

    • Project description: address, suite, current use, proposed use and scope.
    • Existing information: available drawings, site measurements and confirmed building-system conditions.
    • Design package: coordinated architectural and relevant professional drawings.
    • Owner and landlord requirements: necessary consents, work letters and access arrangements.
    • Application requirements: the current forms, supporting reports and fees identified for the project.

    Have the responsible team confirm the actual submission requirements. A checklist copied from a different occupancy or municipality may be incomplete.

    Separate review from permission to start

    An application receipt is not an issued permit. Track reviewer comments, revisions, issuance conditions and the scope authorized before scheduling affected construction. Agree on who answers comments and updates each drawing discipline. Keep a current approved set available to the construction team.

    Review time cannot be guaranteed by this guide. Missing information, design changes and project complexity affect the sequence. Build the schedule around confirmed milestones rather than a promised generic number of weeks.

    Plan inspections before work is concealed

    Before construction, identify required inspection stages with the permit holder and responsible trades. Coordinate bookings and access. Do not cover work that needs inspection before the required review has occurred. Keep records of comments, corrections and approvals with the project documents.

    If the scope changes, have the project team determine whether revised drawings or approvals are required before carrying out the change. Substituting a product or relocating a wall can affect more than the finish schedule.

    Opening and handover

    Confirm which final inspections and other approvals apply before occupying or opening the altered premises. Building approval, landlord acceptance and business-opening requirements are separate checks. Prepare turnover documents, testing records and outstanding deficiencies for the owner.

    Use the Vancouver project guide to prepare a contractor brief, and review accessibility by jurisdiction before relying on a generic online checklist.

    Who should answer project-specific code questions?

    The relevant authority and qualified project professionals should assess the actual building and proposal. A general guide cannot establish the permit exemption, occupancy classification or upgrade scope for a particular suite.

    Email build@buildershaus.com with the city, address, proposed use and available drawings for project enquiries. This planning resource does not issue permits or promise approval.

    Frequently Asked Questions

    Can work start when the application is submitted?+

    Submission is not permit issuance. Confirm the authorization required for the specific work before starting.

    Will a building permit cover every trade?+

    Do not assume so. Confirm the building and trade approvals and any separate operating requirements for the actual project.

    Who confirms whether interior work is exempt?+

    Describe the proposal to the relevant authority and project professionals. The answer depends on the scope, use, building and jurisdiction.

    Ready to Start Your Project?

    Tell us where your property is, what you want to change and when you want the work done.

    Get a Free Estimate
    Estimators.io
    Tenant Improvement, Annacis Island Framed New walls

    · TI Contractors Editorial

    Office fit-outs: plan the walls, then coordinate the ceiling

    Use real office construction photographs to prepare a clearer tenant-improvement brief, from partition layout to access above the ceiling.

    Read the illustrated guide →

    PROJECT FIELD NOTES · OCTOBER 27, 2026

    Restaurant fit-outs: one room, several connected scopes

    Restaurant fit-outs place many interfaces inside a compact space. A finished photograph may show the atmosphere, but it rarely explains how the walls,.

    Read the new project field note →