    Burnaby Commercial Renovations: Approvals, Access and Scope

    3 min readJuly 14, 2026By TI Contractors EditorialUpdated 2026-10-05

    Quick answer

    Plan a Burnaby TI around the property, proposed use and current approval sequence. Check landlord access rules and system capacity before comparing construction bids.

    Start with the approval sequence

    Burnaby's commercial renovation page identifies tenant improvements among the work requiring a building permit. It also notes a development-approval process change effective July 1, 2026: some projects need a Development Permit before a Building Permit can be submitted or issued. Confirm which sequence applies to your proposal; this is not a rule that every interior renovation needs both permits.

    Send the City a clear description of the current and proposed use, interior and exterior changes, and relevant property information. Obtain the current checklist before commissioning a submission around an old permit example.

    Different buildings create different coordination problems

    In a Metrotown or Brentwood tower or podium, ask about delivery access, elevators, common-area protection and connections to shared systems. In a standalone Kingsway unit, investigate equipment routes, frontage and loading constraints. For Big Bend industrial premises, start with the proposed process and equipment, not an office finish package.

    These are site-review questions, not claims that every building in a district has the same construction standard or cost. The landlord's written requirements and actual inspection should control the estimate.

    Check the systems before planning rooms

    • Confirm available electrical supply and the proposed equipment loads.
    • Identify ventilation serving the suite and who controls it.
    • Coordinate washrooms, drains and plumbing routes with the layout.
    • Review fire protection, exit routes and proposed partition changes with the designer.
    • Establish access for maintenance after ceilings and cabinetry are installed.

    Do not treat empty panel spaces or an existing rooftop unit as proof of spare capacity. Ask the relevant designer or contractor to document the checks supporting reuse.

    Separate tenant work from common-property work

    Write down which party approves penetrations, roof work, shutdowns and work in shared corridors. Determine who arranges notifications to other occupants. Include landlord review time in the schedule and obtain current equipment lead times before committing to an opening date.

    For strata-controlled premises, confirm the applicable approval process and boundaries with the strata representative. A lease signature does not itself establish consent for all alterations.

    Compare proposals and plan turnover

    Ask each bidder to identify quantities, allowances, exclusions, permit responsibilities and inspection coordination. Have differences reconciled before award. Request a turnover list covering approved changes, test results, operating instructions and remaining deficiencies. The project is not operationally complete simply because the paint is dry.

    No verified Burnaby price table or approval-duration guarantee is offered here. Use current project estimates and authority feedback for the specific premises.

    Sources and project-specific checks

    Sources checked October 5, 2026. This guide provides planning questions; the project team should confirm the requirements and current documents for the actual address and scope.

    Continue planning

    For a project enquiry, send the city, address, proposed use and available drawings to build@buildershaus.com. Confirm contractor availability and scope directly.

    Frequently Asked Questions

    Did Burnaby change its development approval process in 2026?+

    The City notes a July 1, 2026 change under which some projects need a Development Permit before Building Permit submission or issuance. Confirm the sequence for your project.

    Are mall access costs automatically included in a TI bid?+

    Do not assume so. Give bidders the landlord’s access and work rules and ask them to identify the related costs and assumptions.

    Continue exploring TI markets across Metro Vancouver.

    Ready to Start Your Project?

    Tell us where your property is, what you want to change and when you want the work done.

    Get a Free Estimate
    Estimators.io
    Tenant Improvement, Annacis Island Framed New walls

    · TI Contractors Editorial

    Office fit-outs: plan the walls, then coordinate the ceiling

    Use real office construction photographs to prepare a clearer tenant-improvement brief, from partition layout to access above the ceiling.

    Read the illustrated guide →

    PROJECT FIELD NOTES · OCTOBER 27, 2026

    Restaurant fit-outs: one room, several connected scopes

    Restaurant fit-outs place many interfaces inside a compact space. A finished photograph may show the atmosphere, but it rarely explains how the walls,.

    Read the new project field note →