    Vancouver Tenant Improvement Planning: Scope, Permits and Bids

    4 min readJuly 14, 2026By TI Contractors EditorialUpdated 2026-10-05

    What should you do before hiring a Vancouver TI contractor?

    Confirm that the proposed use is suitable for the premises, inspect the existing building systems, obtain the landlord’s work requirements, and prepare a written scope before comparing bids. A low construction price is not useful if it excludes the work needed to open the business.

    This is a planning guide for tenants and property managers. It is not a contractor availability guarantee or a quotation for a particular building.

    Start with the suite, not a neighbourhood price

    Two offices on the same street can require very different work. A recently occupied suite with reusable rooms is different from a shell needing washrooms, ventilation, lighting and distribution. Ask the landlord for existing drawings and maintenance records, then have the relevant professionals verify conditions on site.

    • Existing use and proposed use: record the intended business, anticipated occupancy and changes to rooms or circulation.
    • Base-building systems: confirm available electrical supply, ventilation, plumbing connections and fire protection interfaces.
    • Access and logistics: establish loading arrangements, elevator bookings, work hours, waste removal and protection of occupied areas.
    • Lease responsibilities: identify landlord work, tenant work, reinstatement obligations and any tenant improvement allowance conditions.
    • Uncertain conditions: identify investigations needed before demolition, including any required hazardous-material assessment.

    Which building rules apply in Vancouver?

    Vancouver has its own Building By-law. The 2025 edition generally took effect on September 15, 2025, with transitions for particular provisions. The permit application date and project circumstances matter; have the designer confirm the applicable edition and requirements rather than assuming every renovation triggers the same upgrades. See the City’s Vancouver Building By-law page.

    The City’s forms, checklists and bulletins are the starting point for selecting the correct application documents. Confirm the proposed permit route with the City. A building permit does not automatically cover every trade approval or business-opening requirement.

    Build a price that can be compared

    Give each bidder the same drawings, specifications and site information. Ask for a scope broken down by demolition, partitions, doors, ceilings, finishes, mechanical, electrical and fire protection work. Separate consultant fees, permits, furniture, technology, taxes and contingency so the total project budget is visible.

    Request written exclusions and allowances. If one bidder excludes a new electrical panel and another includes it, their totals cannot be compared directly. Ask how changes will be priced and approved before signing.

    There is no verified neighbourhood price table in this guide. Obtain current, project-specific estimates after the site review. For the budgeting worksheet approach, read budget and scope control.

    Schedule backwards from a realistic opening

    Use milestones for design, landlord review, permit review, procurement, construction, inspections and deficiencies. Confirm which tasks can overlap and which require approvals first. Do not treat a lease commencement date as evidence that construction can begin that day.

    1. Resolve use and scope questions before committing to the layout.
    2. Confirm the permit and consultant requirements.
    3. Obtain written lead times for doors, controls and other specified equipment.
    4. Agree on access, shutdown and inspection arrangements.
    5. Leave time for deficiencies, commissioning and turnover documents.

    Questions to ask shortlisted contractors

    Ask for examples similar in occupancy, size and building constraints to your project. Confirm who supervises the work, how occupied areas are protected, how changes are documented, and who arranges inspections. Check references and the insurance and registration applicable to your project directly; a directory listing is not verification.

    The Burquitlam meeting-room and washroom case study provides a concrete project example. Use the Vancouver city resource for local planning context.

    Send a useful project brief

    Include the address, approximate area, present and proposed use, drawings or photographs, landlord requirements and desired opening date. For site enquiries, email build@buildershaus.com. Confirm the contractor, service area and availability before relying on a proposed schedule.

    Frequently Asked Questions

    How much does a Vancouver tenant improvement cost?+

    The cost depends on existing conditions, scope, systems, specifications and access. Obtain a site-specific estimate with exclusions, allowances, fees and contingency identified; this guide does not provide a verified neighbourhood price list.

    Does Vancouver use the BC Building Code without changes?+

    Vancouver has its own Building By-law, including Vancouver-specific provisions. The project team should confirm the applicable edition, transitions and requirements with the City.

    Can a contractor guarantee the permit date?+

    Permit review is controlled by the reviewing authority. Ask the project team for assumptions, dependencies and an updated schedule rather than treating an estimated date as approval.

    Continue exploring TI markets across Metro Vancouver.

    Ready to Start Your Project?

    Tell us where your property is, what you want to change and when you want the work done.

    Get a Free Estimate
    Estimators.io
    Tenant Improvement, Annacis Island Framed New walls

    · TI Contractors Editorial

    Office fit-outs: plan the walls, then coordinate the ceiling

    Use real office construction photographs to prepare a clearer tenant-improvement brief, from partition layout to access above the ceiling.

    Read the illustrated guide →

    PROJECT FIELD NOTES · OCTOBER 27, 2026

    Restaurant fit-outs: one room, several connected scopes

    Restaurant fit-outs place many interfaces inside a compact space. A finished photograph may show the atmosphere, but it rarely explains how the walls,.

    Read the new project field note →