    RESTAURANT

    Commercial Kitchen Design: Workflow, Equipment and Services

    3 min readDecember 5, 2025By TI Contractors TeamUpdated 2026-10-05

    Quick answer

    Start kitchen design with the menu and workflow, then coordinate equipment, clean and dirty routes, ventilation, plumbing, electrical services and health review.

    Map the work before drawing cabinets

    Describe how deliveries enter, where food is stored, how preparation proceeds, how finished dishes leave and how dirty dishes and waste return. Walk through a busy service period on the proposed plan. Identify crossing paths and places where staff would have to move equipment or stock to work.

    A compact menu and a changing menu can lead to different equipment choices. Document likely changes so the design team can distinguish a genuine future requirement from speculative oversizing.

    Create one equipment schedule

    Collect manufacturer information for cooking, refrigeration, washing and preparation equipment. Use the same schedule for the food-service designer, mechanical and electrical designers, equipment supplier and contractor. Mark owner-supplied equipment clearly and assign responsibility for delivery, installation and final connections.

    • Record model numbers and overall dimensions.
    • Identify required services and manufacturer clearances.
    • Show doors, drawers and service panels in their open position.
    • Plan cleaning and maintenance access.
    • Confirm what happens if a specified model becomes unavailable.

    Coordinate above and below the kitchen

    The kitchen layout affects more than the visible counters. Ask the project team to coordinate exhaust and make-up air, service routes, drains, fire protection and access to equipment. Resolve clashes before rough-in. Do not assume that a hood left by the previous operator suits the new menu or appliances.

    Existing drawings help, but field verification is needed where the design depends on hidden services or equipment condition. Identify investigations in the preconstruction scope rather than discovering the route only after demolition.

    Obtain the relevant health review

    Use the health authority responsible for the property. Vancouver Coastal Health and Fraser Health provide food-business approval information linked below. Discuss the proposed operation and plan before construction. The health review is not a substitute for municipal or other required approvals.

    Have the design team establish the applicable materials, fixtures and arrangements; this article does not prescribe universal sink counts, ventilation rates or dimensions. Those depend on the operation and governing requirements.

    Evaluate substitutions as design changes

    When a supplier proposes a replacement appliance, compare service demand, heat output, dimensions, access and approval implications as well as price. Obtain the relevant design review before purchasing. Keep the drawings and equipment schedule consistent with what will actually be installed.

    Test the finished working space

    At handover, check the equipment functions, staff access, cleaning procedures, storage arrangements and maintenance information. Record start-up and testing documents required by the project. Keep a list of unresolved defects and the responsible parties. Staff should know who to contact for equipment warranty issues and who maintains shared building systems.

    Sources and project-specific checks

    Sources checked October 5, 2026. This guide provides planning questions; the project team should confirm the requirements and current documents for the actual address and scope.

    Continue planning

    For a project enquiry, send the city, address, proposed use and available drawings to build@buildershaus.com. Confirm contractor availability and scope directly.

    Frequently Asked Questions

    Can I reuse an existing hood?+

    Have the relevant design professional assess its condition and suitability for the proposed equipment and operation. An existing installation does not automatically fit a new concept.

    Why keep a single equipment schedule?+

    It helps all disciplines coordinate the same models, dimensions and service requirements, and makes substitutions visible before installation.

    Ready to Start Your Project?

    Tell us where your property is, what you want to change and when you want the work done.

    Get a Free Estimate
    Estimators.io
    Tenant Improvement, Annacis Island Framed New walls

    · TI Contractors Editorial

    Office fit-outs: plan the walls, then coordinate the ceiling

    Use real office construction photographs to prepare a clearer tenant-improvement brief, from partition layout to access above the ceiling.

    Read the illustrated guide →

    PROJECT FIELD NOTES · OCTOBER 27, 2026

    Restaurant fit-outs: one room, several connected scopes

    Restaurant fit-outs place many interfaces inside a compact space. A finished photograph may show the atmosphere, but it rarely explains how the walls,.

    Read the new project field note →