Occupied Office Renovation Planning
How to phase a tenant improvement around staff, customers, dust, noise, deliveries and building rules.
Start with constraints, not finishes
An occupied renovation succeeds when access hours, noisy-work windows, elevator bookings, shutdowns and temporary protection are documented before construction. The phasing plan should identify which rooms remain operational and how occupants reach them safely.
Break the work into controlled zones
Small work zones reduce disruption and make daily cleanup measurable. Framing, electrical, mechanical, drywall and painting should move through each zone in a planned sequence rather than reopening the whole office at once.
Protect schedule and indoor air
Use sealed barriers, negative-air equipment where appropriate and documented cleanup. Long-lead doors, glass, millwork and fixtures should be released before demolition begins.